Every tier fixes the operations it covers, the interval it applies to, and the parts and fluids it consumes. Whatever falls outside that list is written down too, with its own figure and its own decision for you to make.
Scope is agreed before a lift is raised. A scheduled package names each operation, the labour hours it consumes at our published hourly rate, and the part numbers and quantities involved. Nothing is added to the invoice on the strength of a verbal suggestion.
Pricing runs in two stages. The preliminary quote is generated from the vehicle details you give us and the standard scope of the package. It is an estimate, not a bill. The confirmed estimate is issued in writing after inspection, and work begins only once you approve it.
The diagnostic session is charged at 850 UAH and credited toward labour when the recommended work is approved and performed at the same visit. Other charges are stated as figures rather than described as additional costs: see exclusions and fees.
Compare tiers side by side in the package table, or go straight to booking a visit.
Inclusions
Totals are preliminary until an advisor confirms the scope in writing after inspection. The 850 UAH diagnostic session is credited toward labour when the recommended work is approved and performed at the same visit. Fees outside package scope are listed under exclusions and fees.
Scope notes
Package prices cover the operations printed in each tier. Everything below sits outside that scope and appears as its own line on the estimate, with the amount written down before any work begins.
Labour outside package scope is billed at 980 UAH per hour, in 0.1 hour increments. Any item above is approved with you before it is added, and it is logged to the vehicle dossier whether you accept it or not. Reserve a slot and get the fees confirmed in writing.
Next step
Send your vehicle details and chosen maintenance package. A service advisor replies with a line-by-line estimate: operation, labour hours at the published rate, part numbers, quantities and line totals, plus every named fee before any work starts.